Hot Metal Baghouse

Steelmaking Hot Metal Charging Upgrade

As part of a $119 million investment in its primary steelmaking operations at ArcelorMittal Dofasco Inc., JNE Consulting was actively involved with the overall project management of a baghouse, from detailed engineering, contract administration, construction management and QA/QC for the equipment procurement and installation. The overall project was anticipated to increase slab capacity by 25% to 5 million tons. The purpose for the project was for a steelmaking hot metal charging upgrade.

Equipment Overview

  • System Volume: 110,000CFM @ 275 Degrees F

  • Main Exhaust Blower: 450 HP (1800 RPM)

  • Total Number of Filters: 1800 (120 Inches Long by 6 Inches Diameter)

  • Spark Arrestor